Monday 9 July 2012

Arnhem Central Platform Roofs - UNstudio




As passenger numbers continue to grow at Arnhem Central, the railway station's infrastructure is being substantially revitalized. Most recently, a fourth platform has been added, and all of the roofs have been replaced with a new design developed by Dutch architecture practice UNstudio.


An elevated footbridge connects the passenger waiting areas with each other and the north entrance to the train station. 


Last July the platform tunnel opened to the public, while construction of the transfer terminal will happen in two phases and is set to open for service in 2014. 









No comments:

Post a Comment