Millenium Bridge, Bali, Indonesia
The Millenium Bridge PT Bamboo Pure, was built in four months, and connects building on the Grenn School Bali campus, to adjoinginf areas. So named to reflect the millenium teachings the school is built upon. Paid for by local parents and community members, each of of the 192 supporting beams has their names engraved on it.
No comments:
Post a Comment